Body Receiving 1960

I stood and looked at this view (facing east) myself many times. Even though I never worked body receiving, many of my friends did. The receiving of body’s was a material department job. Before the creation of Buick City the workers in Material Control were designated as department (or group) #88.
This unique view during construction shows factory #04 (left) and #01 (right). Notice the worker at the top.
This view of the new body receiving structure is facing east. That is old factory #01 at the left with #84 engineering in the distance. The first three photos are from the Buick research Gallery and show the reflection from the Mylar protection.

Here’s the new body receiving structure being built in 1960. The building it’s attached to is factory #04, you are looking west. The windows you see through the unfinished structure are on factory #01 which will be removed in 1963. This was the entry point of all Buick body’s from late 1960 until February 1985 and the creation of Buick City.
Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s